|
Springfield-Branson National Airport
This week the airplane ramp area gets limed—meaning that lime is mixed with the soil. Water is used during the mixing process. Once the mixture dries out it's hard as a rock. This provides a stable foundation for the asphalt and concrete that goes on top. Meanwhile, work continues on the curtain wall and tile.
| Page | 1 | 2 | |
|
|
|
|
| |||||
|
|
|
|
| |||||
|
|
|
|
| |||||
|
|
|
|
|
| Total images: 32 | Last update: 6/18/08 2:19 PM | © JAlbum & Chameleon | Help |