Up Midfield Terminal Construction June 29, 2008 Prev Next Slideshow

 At first page  Next image  Index page
 
 
 
 
 
  WCC, SGF Term, 29 Jun 08 059.JPG - Looking north. The road at the bottom of the frame is State Highway 266 (West Chestnut). The dirt path leading from 266, to the top of the frame, is the road bed for Airport Blvd. It leads to the new terminal, which is near the top of the frame.  
WCC, SGF Term, 29 Jun 08 065
WCC, SGF Term, 29 Jun 08 092
WCC, SGF Term, 29 Jun 08 042
WCC, SGF Term, 29 Jun 08 006
WCC, SGF Term, 29 Jun 08 005

Looking north. The road at the bottom of the frame is State Highway 266 (West Chestnut). The dirt path leading from 266, to the top of the frame, is the road bed for Airport Blvd. It leads to the new terminal, which is near the top of the frame.
Total images: 19 | Last update: 7/11/08 3:41 PM | Help
Click here to view the non-mobile version